It was moved and seconded
THAT Council support the 2020 Capital Budget Request for Water Utility as follows:
C2020-54 RVWTP Transmission Mains Design $200,000
C2020-55 PVR Chamber Hatch Replacement $40,995
C2020-56 Rose Valley Dam to McDougall Transmission Main Inspection $75,000
C2020-57 McIver and Gorman Water Main $250,000
C2020-58 Install Filter Trough Weirs $65,000
C2020-59 Replace DAF Chains and Brushes $75,000
2020-60 PRV Stations Inventory Required to Conduct Scheduled/Reactive Maintenance and Renewal of Components $128,888
C2020-61 Emergency backup generator installation / Mobile generator connections $155,200
C2020-62 Mission Hill Reservoir Road Access and Safety Improvements $75,000
C2020-63 PCWSA PRV Assessment / Improvement Strategy $125,000
C2020-64 RVWSA Cathodic Protection System Renewal Upgrades $68,000
C2020-65 Water Booster Station Critical Spare Pumps and Motors $165,649
C2020-66 PCWTP Diversion Structure Design $137,500